На главную страницу
На главную страницу NOVOSIBIRSKENERGO
OPEN JOINT STOCK COMPANY OF POWER-ENGINEERING AND ELECTRIFICATION
Address of Novosibirskenergo OJSC Director General
Русская версия

ANNUAL REPORT 2005
ANNUAL REPORT 2004
ANNUAL REPORT 2003
INFORMATION
BRIEF HISTORY
ACTIVITIES
INDICATORS
SHAREHOLDERS
REFORMS
MANAGEMENT
FINANCIAL STANDING
INVESTMENT
PUBLIC ACTIVITES
COMPANY INFORMATION
ANNUAL REPORT 2002
News
Brief History
Financial statements 2005
Financial statements 2006
Financial statements 2007

Search  

Rambler's Top100 Service
List100 Rating
be number one
Яndex
Aport Ranker
Русская версия

BRIEF HISTORY OF THE COMPANY

1911 - Novo-Nikolaevsk municipal electricity generation plant was put in operation.

1924 - Beginning of construction of Novosibirsk Thermoelectric Power Plant (TPP-1) on the right bank of the river.

1931 - Regional Power Management Company Zapsibenergo was established in Novosibirsk for management of the power sector of West Siberia.

1935 - The first turbine with capacity of 24 thousand KW was deployed at TPP-2. Completion of construction of a power transmission line (PTL) of 35 KV connecting TPP-1 and TPP-2 for parallel work.

1936 - The first heating network from TPP-1 was put in operation.

1942 - The first turbine of TPP-3 was put in operation.

1944 - Zapsibenergo was reorganized into Regional Electricity Administration "Novosibirskenergo".

1954 - The power transmission line of 110 KV, Novosibirsk-Barabinsk-Omsk, was put in operation that made it possible to switch Trans-Siberian railroad to electric traction, and that created conditions for broad and centralized electrification of agriculture in Novosibirsk Oblast. The first turbines of Barabinsk Regional Power Station were put in operation.

1957 - The first turbine of Novosibirsk Hydroelectric Power Plant (HPP) was put in operation.

1960 - Power Transmission Line (PTL) of 220 KV, Novosibirsk-Belovo, uniting the Novosibirsk-Omsk power node with the Kuzbass Energy System was put in operation. TPP-4 was added to the balance of the Energy System.

1972 - The first in the Energy System super-high voltage units - PTL 500 KV and substation "Zarya" - were put in operation.

1978 - PTL of 500 KV, Novosibirsk-Barnaul-Rubtsovsk, was put in operation, through which the Novosibirsk Energy System and the Siberian Energy Union have joined the Unified Energy System of the USSR.

1985 - The first power unit of Novosibirsk TPP-5 was put in operation.

1993 - The Energy System was privatized, and OJSC Novosibirskenergo was incorporated.

2002 - The restructuring program of OJSC Novosibirskenergo was adopted.