ANNUAL REPORT 2005
ANNUAL REPORT 2004
Company Information
Business Activities
Financial Situation
Reforms
Investment
Social Agenda
ANNUAL REPORT 2003
ANNUAL REPORT 2002
News
Brief History
Financial statements 2005
Financial statements 2006
Financial statements 2007

Search  

Rambler's Top100 Service
List100 Rating
be number one
Яndex
Aport Ranker
Русская версия

Company Information





Key characteristics of the company



The Novosibirsk energy system supplies electric power to the Novosibirsk Region and assures centralized heat supply to the city of Novosibirsk and the city of Kuibyshev of the Novosibirsk Region.


Novosibirsk Region area 170.2 thousand square meters;
Novosibirsk Region population 2672.8 thousand;
   including urban population 2008.4 thousand;
      including Novosibirsk population 1413 thousand.
 





OJSC Novosibirskenergo’s electric power stations:

Station First unit launch Designed electric capacity, MWatt. Number of turbines/date of last unit launch Designed thermal capacity, Gkal/hour Number of boilers/date of last unit launch Fuel
TPP-2 November 1935 340 7 / December 1987 1015 8 / December 1970 Kuznetsk coal, gas, furnace oil
TPP-3 October 1942 499,5 10 / October 1974 1266 12 / June 1983 Kuznetsk coal, Kansk-Achinsk coal (fourth cycle), furnace oil
TPP-4 May 1956 368,5 6 / June 1970 1649 11 (6 WB) / September 1970 Kuznetsk coal, gas, furnace oil
TPP-5 December 1985 1080 6 / September 2004 2850 8 (7 WB) / December 2004 Kuznetsk coal, gas (1, 2 boiler), furnace oil
BTPP December 2003 114 5 / December 2003 293 7 (1 WB) / December 1958 Kuznetsk coal, furnace oil, gas
NHPP November1957 455 7/ March 1959 - - -
TOTAL:   2857 41 7073 46 (14 WB ) -



Designed electric capacity of the energy system, MWatt
Largest available picture


In 2004 the established electric and thermal capacity of the energy system was increased by 180 MWatt and 275 Gkal/hour respectively. These results were achieved in the course of implementation of the Novosibirksenergo OSJC investment program to launch the energy unit st. 6 at TPP-5, renovation of the water boiler КVGМ-50 and the installation of the steam boiler BEM-25/1,4-270 at Barabinskaia TPP. In addition, in 2004, a significant amount of resources has been utilized to install turbine st. 14 with the capacity of 110 MW at TPP-3, the launch thereof anticipated early in 2005 (the turbine’s test shot took place in December 2004).


In 2005, the electric and thermal capacity of the energy system will be 2,857 MW and 6,878 Gcal/hour respectively, which will meet electric power demand of the Novosibirsk region for the next 7-10 years and will also allow to bring in new consumers.


As of 1 January 2005, the length of the route overhead transmission lines on the balance of Novosibirskenergo OSJC is:


Voltage degree, KW Length, km
220 1536
110 4828
35 4484
10 20950
6 65
0.4 13542
Total 45405



The number of substations of 35-220 Kwatt are shown in the table:


Substation, KW Number of substations
220 kV 11
110 kV 158
35 kV 158
Total 327



The designed capacity of transformer substations is 9,945.8 thousand KW.


As of 1 January 2005, there are 288.065 km of heat pipelines on the balance of Novosibirskenergo OSJC (in double-pipe measurement). The length of heat pipelines of the heat networks is listed in the table by their service time.


Operation term limits Length, km % of total length
Up to 5 yrs 16,472 5.7
Up to 10 yrs 40,209 14.0
Up to 15 yrs 46,488 16.1
Up to 20 yrs 26,097 9.1
Up to 25 yrs 26,889 9.3
Over 25 yrs 131,91 45.8
Total 288,065 100